|
 |
| |
|
| |
The pulverized material can be graded to specific flow line grades to ensure proper drainage.
Emergency and local traffic may continue to use roadway during all phases of construction.
Maximum density is achieved after a rolling pattern is established using a nuclear density gauge.
|
|